Não encontrou a informação que estava procurando ?

 

 

CHART VI - PORT EQUIPMENT UTILIZATION

(taxes owed by the requester)

1 - Shore crane, per period of six hours or fraction...................................................R$ 200,00
2 - Shore crane (Quay-side crane), per hour or fraction...........................................R$ 90,00
3 - Forklift, per period of 6 hours or fraction:
     3.a - With a capacity of up to 3 tons......................................................................R$ 72,00
     3.b - With a capacity from 5 to 10 tons .................................................................R$ 120,00
     3.c - With a capacity of 12 tons ............................................................................R$ 180,00
     3.d - Top Loader for containers ............................................................................R$ 370,00
     3.e - Reach Stacker for containers .......................................................................R$ 600,00
3.1 - Forklift per hour or fraction:
    3.1.a - With a capacity of up to 3 tons....................................................................R$ 12,00
    3.1.b - With a capacity from 5 to 10 tons ...............................................................R$ 20,00
3.2 - Top Loader Foklift for containers, per half period (3 hours) or fraction.......................................................................................................................R$ 200,00
4 - Forklift, per month or fraction:
     4.1 - Top Loader for containers...........................................................................R$ 12.000,00
     4.2 - Reach Stacker for containers......................................................................R$ 19.000,00
5 - Tug utilization, per manoeuvres:
     5.1 - Vessels up to 2,500 DWT............................................................................R$ 812,40
     5.2 - Vessels up from 2,501 to 5,000 DWT..........................................................R$ 1.026,00
     5.3 - Vessels up from 5,001 to 10,000 DWT........................................................R$ 1.161,60
     5.4 - Vessels up from 10,001 to 20,000 DWT......................................................R$ 1.438,80
     5.5 - Vessels up from 20,001 to 30,000 DWT......................................................R$ 1.657,20
     5.6 - Vessels up from 30,001 to 40,000 DWT......................................................R$ 1.874,40
     5.7 - Vessels up from 40,001 to 50,000 DWT......................................................R$ 2.179,20
6 - Tractor with trailer, per period of 6 hours or fraction..........................................R$ 40,00
7 - Equipments and materials not specified ............conditions to be agreed.
     7.1 - Utilization of a spreader for heavy cargos, per period of 6 hours or fraction......................................................................................................................R$ 30,00
8 - Road scale, for weight........................................................................................R$ 1,80


Approved by Resolution number 025/2000 on 06-13th-2000; modified on 12-18th-2000 by Resolutions numbers 033/00 and 034/00; on 02-20th-2001 by Resolution 009/01; on 08-10th-2001, changed by Resolution number 020/01; on 09-9th-2001 by Resolution number 025/2001; by Deliberation number 02/01, on 11-8th-2001; by Resolution 023/2002; on 11-04th-2002; by the “DIREX”Public Official Letter number 481/2005; on 08-24th-2005 by the Council of the port Authority ( CAP) Deliberation number 002/2006 on 04-10th-2006; by “DIFIN” Official Letter number 570 on 09-06th-2006; by Resolution number 012-2007 on 08-26th-2007; by Resolution number 014/2007 on 09-26th-2007.

REMARKS:

a) Items 1, 3 and 6 of this chart are referred to the rental without considering the operators, having the requirer to take also upon himself the responsability in the case of fortuitous damages arised from accidents.
b)
The amounts of item 4 include the maintenance services and exclude the operators and fuel which will be susceptible of reimbursement to the Port of Itajaí.
c) The amounts for conventional taxes of this chart will be established by the Port Authority, through an Order or Service Instruction.
d) The tug utilization tug include "lumpsum" services (including Sundays and feast days) is ruled by the Resolution 068/99.
e) In the item 3.1 the minimum request will be of 2 (two) hours.
f) In the case of forklifts requested per month, the requirer firm or person will be responsible for the fuel, which will be paid apart at the retail price on the day of the payment.
g) The forklifts demanded per period, half period or hour will have the cost of the fuel already included in the price.
h)
The control of the hour (or fraction) of utilization is done by means of a time clock located at the Maintenance Management, since the moment of the equipment departure until it is returned to the same place.

DEFINITION AND APPLICATION:

The taxes of the present chart remunerate the rental of the Port Autority's equipments.


 CHART
  [ BACK ] [ UP]